Premium Power Unlocked.

Continuous peace of mind, around the clock, with electromagnetic power recycling.

Backed by

180 CapitalAtlas GlobalVirtue Ventures
AmpMiner Zero deployed in facility

Waste watts become work watts.

We don't just filter electrical waste; we monetize it. AmpMiner Zero transforms stray losses into clean power without new infrastructure, unlocking a 170 GW ($194Bn/yr) global asset class of recoverable productivity.

Capture

Installs with zero downtime into 3-phase subpanels, instantly targeting and trapping your facility's electromagnetic noise, stray current leakage, and dirty harmonics.

Convert

Patented Field Effect Conversion (FEC) restores trapped, non-fundamental magnetic losses back to 50/60 Hz, reducing upstream kVA demand while optimizing usable load power (kW).

Credit

Our innovative Joule Processing Unit (JPU) cryptographically signs recycled power in real time, validating this thermodynamic efficiency into a settlement-grade CO₂ avoidance asset.

The Problem

The Crisis:
Degradation is Surging.

As AI and electrification strain the grid, we don't just have a generation problem. We have a growing dirty harmonics problem. While the world spends trillions on expanding infrastructure, STRAY is positioned to unlock 170 GW of capacity trapped in our existing networks.

These waste watts, known as "ghost amps," burn off as destructive electrical noise, actively degrading hardware, shrinking transformer headroom, and negatively affecting up to 40% of generated power.

Source: Bloomberg Graphics, 2024

Read on Bloomberg

Impact Stack

Data backed by 20+ pilots.

Capacity Recovery

170 GW

Recovery Decreases kVA

Power Recycling

$194Bn

Optimize kW

Maintenance Avoidance

100%

Decrease THD

STRAY

AmpMiner

JOULES PROCESSING UNITS (JPU)

Datacenters

Defense

Industrial

Logistics

Commercial

Retail

Substation

Substation

Substation

Defense Manufacturing Spotlight

Since implementing STRAY, ACRA has achieved a 100% reduction in burnout motor controllers and other electrical component failures on our CNC machines, eliminating costly downtime and saving many thousands annually.

Jed Burmahln, General Manager, ACRA Aerospace

ACRA Aerospace

How We Work

01

Zero Downtime

Site Evaluation

Initial on-site assessment of your facility's electrical infrastructure. We identify recoverable capacity with zero disruption to your operations.

02

Zero Risk

Efficiency Services Agreement (ESA)

Our performance-based model means you only pay from realized savings. No risk, no uncertainty. Just measurable, validated results.

03

Zero Upfront Cost

AmpMiner Deployment

Full deployment and commissioning of AmpMiner Zero, with ongoing monitoring and optimization via our JPU chip.

Resources

Technical Resources

Product Datasheet

Complete technical specifications and installation guide

Download PDF

IEEE UPEC Paper

Peer-reviewed field effect conversion research

Download PDF

Case Studies

Real-world validation from 20+ deployments

View Studies

Ready to Recover Lost Capacity?

Schedule a technical consultation to see where AmpMiner can deliver measurable savings for your facility.