
Continuous peace of mind, around the clock, with electromagnetic power recycling.
Backed by
We don't just filter electrical waste; we monetize it. AmpMiner Zero transforms stray losses into clean power without new infrastructure, unlocking a 170 GW ($194Bn/yr) global asset class of recoverable productivity.

Capture
Installs with zero downtime into 3-phase subpanels, instantly targeting and trapping your facility's electromagnetic noise, stray current leakage, and dirty harmonics.
Convert
Patented Field Effect Conversion (FEC) restores trapped, non-fundamental magnetic losses back to 50/60 Hz, reducing upstream kVA demand while optimizing usable load power (kW).
Credit
Our innovative Joule Processing Unit (JPU) cryptographically signs recycled power in real time, validating this thermodynamic efficiency into a settlement-grade CO₂ avoidance asset.
The Problem
As AI and electrification strain the grid, we don't just have a generation problem. We have a growing dirty harmonics problem. While the world spends trillions on expanding infrastructure, STRAY is positioned to unlock 170 GW of capacity trapped in our existing networks.
These waste watts, known as "ghost amps," burn off as destructive electrical noise, actively degrading hardware, shrinking transformer headroom, and negatively affecting up to 40% of generated power.
0 GW
Trapped capacity
0%
Power affected

Source: Bloomberg Graphics, 2024
Impact Stack
170 GW
Global recoverable capacity from existing infrastructure. No new generation needed.
20 GW immediate US availability
$194B
Annual global asset class of recoverable productivity from electromagnetic losses.
Converts waste → usable kW
100%
Reduction in burnout motor controllers and electrical component failures on treated circuits.
Validated by ACRA Aerospace
0+
Deployments
0%
Customer retention
0+
MWh recovered
0M
mt CO₂ avoidance (US)
STRAY Service Stack
Capacity 170GW
Recovery · Decrease KVA Demand
Power Recycling $194Bn / Yr
Maintenance Avoidance
Decrease THD

AmpMiner
Joules Processing Unit (JPU)
AI
Datacenters
Manufacturing
Telecom
Retail
Distributors
Substation
Substation
Substation

Defense Manufacturing Spotlight
“
Since implementing STRAY, ACRA has achieved a 100% reduction in burnout motor controllers and other electrical component failures on our CNC machines, eliminating costly downtime and saving many thousands annually.
Jed Burmahln, General Manager, ACRA Aerospace

PROCESS
How We Work
Site Evaluation
Initial on-site assessment of your facility's electrical infrastructure. We identify recoverable capacity with zero disruption to your operations.
Efficiency Services Agreement (ESA)
Our performance-based model means you only pay from verified savings. No risk, no uncertainty. Just measurable, validated results.
AmpMiner Deployment
Full deployment and commissioning of AmpMiner Zero, with ongoing monitoring and optimization via our JPU chip.